Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #798

Short Term Public Notice Under Rule 51.333(a). CenturyLink's (Qwest Communications) Internet address: http://www.centurylink.com/disclosures/.

Copper Retirements in Minnesota and Nebraska.

First Implementation Date:

August 1, 2018

Original Date Posted:

January 29, 2018

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.

Description of any changes in rates, terms or conditions that will accompany the planned change(s):

As a general matter, the retirement of these copper facilities will not result in changes to rates, terms and conditions in cases where the affected service is converted to a like-for-like service that is available on the replacement fiber or copper facilities. Interconnecting entities, however, should review the applicable tariff or agreement for certain terms that may apply specifically in cases where the service is provisioned on fiber. In cases where interconnecting entities elect to replace the affected service with an alternative service that CenturyLink QC offers on fiber facilities, the rates, terms and conditions will be as set forth in the tariff or agreement under which CenturyLink offers the replacement service that the interconnecting entity selects. CenturyLink, separately from this notice, will provide interconnecting entities with further information regarding service migration options that CenturyLink offers.

Locations and Timing of Deployment:  

Requirements:

The following gives additional details on the switch decommissioning:

STATE

WIRE CENTER

PLANNED COMPLETION OR RETIREMENT DATE

DA (s)

Job #

Replacing

MN

Rice
SHVWMNRI

08-01-2018

311702

N.327195

Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops and DS-0 loops will not be supported. All other types of unbundled loops will still be available.
NE

North Platte
NPLTNENW

08-01-2018

312206
112209
311202
311202
311202

N.331848
N.332115
N.332620
N.332849
N.332976
Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops and DS-0 loops will not be supported. All other types of unbundled loops will still be available.
Additional Information:

Any person desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
Regulatory Compliance Director
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.