Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #791

Short Term Public Notice Under Rule 51.333(a). CenturyLink's Internet address: http://www.centurylink.com/disclosures/.

Fiber To The Home - Copper Retirements in Minnesota, and Washington.

First Implementation Date:

April 30, 2017

Original Date Posted:

June 27, 2016

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.

Locations, Timing of Deployments & Interface Requirements:

The following gives additional details on the copper retirement(s):

STATE

WIRE CENTER

PLANNED COMPLETION OR RETIREMENT DATE

DA (s)

Job #

Replacing

MN St Paul Midway STPLMNMI 4-30-2017 411705 411702 110203 110302 311302 310502 210702, 210803 210702, 210803 210502 210602, 210702 N.015472 N.016739 N.017345 N.019057 N.012790 N.020391 N.016895 N.016892 N.014089 N.014990

Growth in the area requires CenturyLink to install Fiber Based Access to its customer. The copper loops will be replaced by fiber loops as customers migrate to higher speed Broadband Internet Access (BIA). Unbundled Copper Loops may not be available to an individual address after the planned completion/retirement date.

This is Fiber-To-The Home (FTTH) overlay architecture.

MN St Paul Midway STPLMNMI 4-30-2017 210602 N.015949

Growth in the area requires CenturyLink to install Fiber Based Access to its customer. The copper loops will be replaced by fiber loops as customers migrate to higher speed Broadband Internet Access (BIA). Unbundled Copper Loops may not be available to an individual address after the planned completion/retirement date.

This is Fiber-To-The Home (FTTH) overlay architecture.

MN Minneapolis 24th MPLSMNTF 4-30-2017 314602 314402 315204, 314602 E.766370 E.766369 E.766365

Growth in the area requires CenturyLink to install Fiber Based Access to its customer. The copper loops will be replaced by fiber loops as customers migrate to higher speed Broadband Internet Access (BIA). Unbundled Copper Loops may not be available to an individual address after the planned completion/retirement date.

This is Fiber-To-The Home (FTTH) overlay architecture.

WA Vancouver Oxford VANCWA01 4-30-2017 310202 N.090049

Growth in the area requires CenturyLink to install Fiber Based Access to its customer. The copper loops will be replaced by fiber loops as customers migrate to higher speed Broadband Internet Access (BIA). Unbundled Copper Loops may not be available to an individual address after the planned completion/retirement date.

This is Fiber-To-The Home (FTTH) overlay architecture.

Additional Information:

Any person desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
Regulatory Compliance Director
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.