Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #790

Short Term Public Notice Under Rule 51.333(a). CenturyLink's Internet address: http://www.centurylink.com/disclosures/.

Copper Retirements in Arizona, Colorado, Idaho, Iowa, Nebraska, New Mexico, North Dakota, South Dakota, and Washington.

First Implementation Date:

April 30, 2017

Original Date Posted:

June 24, 2016

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation.  Replacement cables may be either copper or fiber.  Specific information will be provided with each disclosure.

Locations, Timing of Deployments & Interface Requirements:

The following gives additional details on the copper retirement(s):

STATE

WIRE CENTER

PLANNED COMPLETION OR RETIREMENT DATE

DA (s)

Job #

Replacing

AZ Tucson Cortaro TCSNAZCO 4-30-2017 N/A N.067002 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
AZ Higley HGLYAZMA 4-30-2017 3106 212716 N.086958 N.092323 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
CO Denver Southwest DNVRCOSW 4-30-2017 N/A N.058462 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
IA Des Moines East DESMIAEA 4-30-2017 221305 N.095868 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
ID Nampa NMPAIDMA 4-30-2017 213301 N.088016 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
NE McCook MCCKNENW 4-30-2017 N/A N.092697 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
NM Silver City SLCYNMMA 4-30-2017 311301 N.101329 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
ND Fargo FARGNDBC 4-30-2017 147602 145404 N.089123 N.089135 N.089072 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
ND Dickinson DCSNNDBC 4-30-2017 N/A N.061595 Road move in the area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
SD Rapid City RPCYSDCO 4-30-2017 N/A N.035786 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
WA Vancouver Oxford VANCWA01 4-30-2017 310202 N.090049 Growth in distribution area requires CenturyLink to cut facilities to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
Additional Information:

Any person desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
Regulatory Compliance Director
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.