Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #783

Short Term Public Notice Under Rule 51.333(a). CenturyLink's Internet address: http://www.centurylink.com/disclosures/.

Copper Retirements in Arizona, Minnesota, and Oregon.

First Implementation Date:

July 1, 2015

Original Date Posted:

May 19, 2015

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation.  Replacement cables may be either copper or fiber.  Specific information will be provided with each disclosure.

Locations, Timing of Deployments & Interface Requirements:

The following gives additional details on the copper retirement(s):

STATE WIRE CENTER PLANNED COMPLETION OR RETIREMENT DATE DA (s) Job # Replacing
AZ Tucson Cortaro TCSNAZCO 07-01-2015 212715, 212716, 210113, 210111, 210211, 212011, 212015 E.714249 E.714164 E.714280 E.714029 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
AZ Tucson South TCSNAZSO 09-01-2015 111711, 111311 E.692762 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN Fergus Falls FRFLMNFB 07-31-2015 181002 E.675748 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN Rochester ROCHMNRO 10-30-2015 1612022 E.710827 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN Shoreview Rice SHVWMNRI 10-09-2015 311303 E.755274 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
OR Albany ALBYOR63 07-31-2015 113511, 110961, 111412 E.609084 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
Additional Information:

Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
Regulatory Compliance Manager
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.