Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #776

Short Term Public Notice Under Rule 51.333(a). CenturyLink's Internet address: http://qwest.centurylink.com/disclosures/.

Copper Retirements in Colorado, Idaho and Minnesota

First Implementation Date:

May 30, 2014

Original Date Posted:

March 7, 2014

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.

Locations, Timing of Deployments & Interface Requirements:

The following gives additional details on the copper retirement(s):

STATE WIRE CENTER PLANNED COMPLETION OR RETIREMENT DATE DA (s) Job # Replacing
CO Colorado Springs
CLSPCOMA
12-18-2014 211332 E.367139 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
ID Shoshone
SHSHIDMA
07-31-2014 111011 E.609318 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN Still Water
STWRMNST
05-16-2014 310705 E.605030 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN St. Cloud
STCDMNTO
05-30-2014 421002 E.606233 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN Willmar
WLMRMNWI
05-30-2014 240302 E.619762 Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). After the cut to DLC, copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
Additional Information:

Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
Regulatory Compliance Manager
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.