Attention! Your browser settings show that JavaScript is disabled.



Network Disclosure Announcement #769

Short Term Public Notice Under Rule 51.333(a). CenturyLink's Internet address: http://qwest.centurylink.com/disclosures/.

Copper Retirements in Arizona, Colorado, Iowa, North Dakota, Oregon, and South Dakota

First Implementation Date:

December 31, 2012

Original Date Posted:

August 15, 2012

Summary:

Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.

Locations, Timing of Deployments & Interface Requirements:

The following gives additional details on the copper retirement(s):

This update is needed to reflect a correction to the Wire Center CLLI for Grand Forks, ND.

STATE WIRE CENTER PLANNED COMPLETION OR RETIREMENT DATE DA (s) Job # FDI Address(es) Replacing

AZ

Phoenix South
PHNXAZSO

01-20-2013

311321

E.365915

8409 S 16th St.

Abandonment of approximatley 1855 ft of defective copper cable requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

CO

Steamboat Springs
STSPCOMA

05-12-2013

420331

E.347631

30019 W US Hwy 40

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

CO

Arvada
ARVDCOMA

02-15-2013

411231

E.299310

5290Miller St

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

IA

Des Moines East
DESMIAEA

12-31-2012

336503

E.340796

481 S Hickory Blvd

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

ND

Grand Forks
GDFRNDCO
GDFRNDBC

12-31-2013

350404

E.340737

1028 Columbia Rd S

Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC).  All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

OR

Keizer
SALMOR59

03-31-2013

225831/225832

E.340611

3990 Ward Dr NE
4000 Ward Dr NE

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

SD

Aberdeen
ABRDSDCO

03-31-2013

220202/220302

E.372434

204 N Arch St
802NE3

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

SD

Rapid City
RPCYSDCO

02-12-2013

692302

E.378129

X 618

Growth in distribution area requires CenturyLink to cut facilites to fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported.  All other types of unbundled loops will still be available. 

 

Additional Information:

Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:

Abdennaceur Boudhaouia
303-707-8561
Jamal.Boudhaouia@CenturyLink.com

This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.

Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically

Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.