As CenturyLink and Qwest merge companies, we are working hard to combine our systems. By supplying your service address zip code we will be able to get you to the right location. Thank you for your patience during the merger process.
Sorry, we don't recognize the information you provided.
As CenturyLink and Qwest merge companies, we are working hard to combine our systems. By supplying your service address zip code we will be able to get you to the right location. Thank you for your patience during the merger process.
Copper Retirements in Arizona, Iowa, Minnesota and Washington
First Implementation Date:
March 15, 2012
Original Date Posted:
January 31, 2012
Summary:
Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.
Locations, Timing of Deployments & Interface Requirements:
The following gives additional details on the copper retirement(s):
STATE
WIRE CENTER
PLANNED COMPLETION OR RETIREMENT DATE
DA (s)
Job #
FDI Address(es)
Replacing
AZ
Tucson North TCSNAZNO
05-31-2012
212111
E.290184
R 8100 N Oracle Rd/ 8439 N Oracle
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). Copper reliant services, such as non-loaded copper loops and line sharing will no longer be supported after the cut to DLC; all other types of unbundled loops will still be available.
AZ
Tucson North TCSNAZNO
05-15-2012
212211
E. 289572
8688 N Oracle Rd/ 8798 N Oracle Rd
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
AZ
Tucson North
05-15-2012
213012 & 210415
E.2911385
215 W Old Ina Rd/ F 7601 N Village Av.
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). Copper reliant services, such as non-loaded copper loops and line sharing will no longer be supported once the facilities are cut over to DLC; all other types of unbundled loops will still be available.
IA
Waterloo WTRLIADT
04-01-2012
240703
E. 540644
2001 Wagner
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN
Eden Prairie EDPRMNEP
03-15-2012
210704
E. 289535
5510 W 70Th Street
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
MN
St. Cloud STCDNBTO
04-06-2012
111902
E.290845
4545 CO RD 134
Road construction forces CenturyLink to abandon its copper cables and transfer working services to a fiber fed digital loop carrier system (DLC). All existing services will continue to be supported; however, after the cut to DLC, new copper reliant services, such as non-loaded copper loops will not be supported. All other types of unbundled loops will still be available.
WA
Seattle East STTLWA03
05-04-2012
123001 & 123101
12W2TCM
1901 E Lynn & 2459 19th E
Due to landslide, CenturyLink is forced to re-route its facilities and is moving working services to a fiber fed digital loop carrier system (DLC). Copper reliant services, such as non-loaded copper loops and line sharing will no longer be supported after the cut to DLC; all other types of unbundled loops will still be available.
Additional Information:
Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:
This Network Disclosure is available as a PDF download. If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.
Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement, or contact Jamal Boudhaouia, CenturyLink's Manager of Network Disclosures at Jamal.Boudhaouia@CenturyLink.com or (303) 707-8561.