Network Disclosure Announcement #684
Copper Retirements in Arizona, Iowa, Minnesota, New Mexico, North Dakota, South Dakota and Washington
| First Implementation Date: |
June 4, 2009
|
| Original Date Posted: |
March 20, 2009
|
| Summary: |
Copper Retirements are necessary to respond to various factors in the Outside Plant, including road construction, maintenance problems, and growth accommodation. Replacement cables may be either copper or fiber. Specific information will be provided with each disclosure.
|
| Locations, Timing of Deployments & Interface Requirements: |
The following gives additional details on the copper retirement(s):
|
| STATE |
WIRE CENTER |
PLANNED COMPLETION OR RETIREMENT DATE |
DA (s) |
Job # |
FDI Address(es) |
Replacing |
| AZ |
Craycroft TCSNAZCR |
06-16-2009 |
410813 |
8212SH2 |
4501 S Contractors |
Before 60' BKMA-50 @ 28 KHz = 0.100 dB After 80' ANMW-50 @ 28 KHz = 0.140 dB |
| AZ |
Sunnyslope PHNXAZSY |
12-01-2009 |
212011 |
H81A464 |
1675 W Northern Ave |
Qwest is rerouting service to the SAI at 1675 W Northern Ave. by section throwing service from the old cable DCMC-1500 removing 1,236 feet 24 gauge, DSML-900 removing 170 feet 24 gauge and replacing with DCMZ-1500 2,560 feet 24 gauge and ANMW -300 720 feet 24 gauge increasing the loop by 1,874 feet and increasing the Db loss by 3.2 Db at 28KHz. This is required to remove conflicts with the Phoenix Light Rail train. |
| AZ |
Tucson North TCSNAZNO |
12-15-2009 |
413411 |
9212ULX |
8125 N Como Dr |
This job replaces & relocates the SAI away from drainage and retention wall area, which will increase the F1 footage by 150' as well as the F2 footage by 150'. |
| IA |
Des Moines Dwtn DESMIADT |
07-01-2009 |
226602 |
92C1H2 |
103 SE 3 ST |
Distribution cables must be relocated due to road construction near Raccoon Street and SE 2nd Street. There is a negative impact on the following SAI cable count: 108SE3, 601-625. Cable section replaced: Existing 370' of 24 gauge pic loss @ 28 KHz = 0.61 dB Proposed 820' of 24 gauge pic loss @ 28 KHz = 1.32 dB Increased loss = 0.71 dB @ 28 KHz |
| MN |
Caledonia CLDNMCA |
07-02-2009 |
320202 |
92M1Z5M |
11500 S Prairie Dr (Formerly X D7-A) |
Qwest is placing a new Remote Terminal to replace the existing copper feed to this area due to the reconstruction of CSAH #5. All existing services will continue to work at the completion of the job and no copper F-1 pairs will be available to this Sai. The before loss is 79.01 dB at28Khz which includes 59,468 feet of ANAW and 3,618 feet of ANMW cables (63.08 Kft). The after loss is 28.74 dB at 28Khz which includes 23,675 feet of ANAW cable (23.67 Kft). |
| MN |
Melrose DLTHMNME |
06-04-2009 |
412004 |
92M1XSZ |
4743 Maple Grove Rd |
THIS JOB WILL REPLACE CABLE COUNT = 4743MG, 1-1000 & 1501-1800 BEFORE (1,652' OF 24 GA WITH A dB LOSS OF 0.68 dB @ 1004 HZ) AFTER (1,900' 0F 24 GA WITH A dB LOSS OF 0.75 dB @ 1004 HZ). |
| ND |
West Fargo WFRGNDBC |
07-10-2009 |
340102 |
92F15J3 |
3110 6 St W |
Qwest must relocate a 50 pair cable that is attached to the 32 Ave E bridge. The bridge is going to be replaced with box culverts. The relocation will add 138 feet of ANMW-50 pair. This will add +.54dB loss @ 28 KHz.. |
| NM |
Albq Corrales ALBQNMCR |
06-22-2009 |
310601 |
9251QKQ |
7000 Coors Rd NW |
THIS JOB REPLACES AN EXISTING CABLE ANMW-25 PLACED IN 1999 (356' WITH A dB LOSS OF 0.650). THE 356' WILL BE REPLACED WITH 425' OF ANMW-25 (0.780dB LOSS) |
| SD |
Flandreau FLNDSDCO |
07-15-2009 |
310731 |
92T15ML |
EGAN |
The job 92T15ML will be relocating cable that is in conflict with a road improvement project on SD Hwy 34 near Egan SD. This job will replace cable in three sections of plant. The first section is 768 feet of 22 ga cable that will be replaced with 786 feet of 24 ga cable. This will result in a loss increase of .45 db @ 28 KHz and .09 db @ 1004 Hz. The second section of cable will replace 700 feet of 22 ga cable with 715 feet of 24 ga cable. This will result in a loss increase of .42 db @ 28 KHz and .08 db @ 1004 Hz. The third section of cable will replace 264 feet of 22 ga and 4,436 feet of 19 ga cable with 4,571 feet of 24 ga cable. This will result in a loss increase of 4.11 db @ 28 KHz and .83 db @ 1004Hz. These cables are in direct conflict with the road improvement project and will not be able to be retained. This area is fed by a Series 5 remote terminal. |
| WA |
Abeerdeen ABRDWA01 |
06-22-2009 |
230101 |
92W2AKQ |
6301 Karjala Rd |
Relocate existing cable approximately 35ft east at the Karjala Rd / School Rd intersection to clear way for new County road project. Affects two cable sections. Section 1 - Buried cable crossing Karjala Rd. Before 50ft BKMH-100 @ 28KHz = .080db. After 70ft ANMW-100 and 47ft ANMW-25 @ 28KHz = .200db. A change of .120db. Section 2 - Aerial / buried cable continuing east on Karjala Rd. Before 50ft BKMH-100 @ 28KHz = .080db. After 117ft ANMW-100 @ 28KHz = .200db. A change of .120db. |
| WA |
Vancouver North VANCWANO |
07-30-2009 |
110611 thru 122481 (22 DA's) |
82W23EE |
All F1 copper count |
All five copper cables crossing the Klineline Bridge on NE Highway 99 at NE 119th Street between MH 102 and 103 are being replaced as part of a county bridge replacement project. The dB loss calculations for the individual copper sections are: MH 102 to MH 103. Before: After: 368' ADTC-1500 @ 28 KHz = .94 400' DCTZ-1500 @ 28 KHz = 1.02 Change of +.08 dB loss. 359' CDMC-1800 @ 28 KHz = .59 400' DCMZ-1800 @ 28 KHz = .66 Change of +.07 dB loss. 375' CDTC-3000 @ 28 KHz = .96 400' DCTZ-3000 @ 28 KHz = 1.02 Change of +.06 dB loss. 1,096' ADBH-450 and 180' BHAA-600 1,210' DCMZ-1200 and 60' BHAH-600 @ 28 KHz = . 84 @ 28 KHz = 1.88 Change of +1.07 dB loss. 1,010' BHAA-600 @28 KHz = 1.07 1,210' DCMZ-1200 and 60' BHAH=600 @ 28 KHz = 1.88 Change of +.81 dB loss. |
|
| Additional Information: |
Any customer premises equipment vendor/manufacturer or enhanced services provider desiring additional technical information in conjunction with this Disclosure can contact:
Georganne Weidenbach
Regulatory Compliance Manager
Georganne.Weidenbach@qwest.com
|
This Network Disclosure is available as a PDF download (file size: 144Kb). If you need to print Network Disclosures, the PDF file will give you more flexibility and a higher quality printout than will a Web page, which is designed to be viewed with a Web browser. If you need the Adobe Reader, you can download it for free from Adobe's Web site.
Back to Top - Net Disclosure Main Page
Net Disclosures Listed Numerically
Questions regarding Network Disclosure information can be referred to the individual listed on the Disclosure Announcement or e-mail Dean Martineau, Qwest's Manager of Network Disclosures at a.martineau@qwest.com.
|